2024-02-06 — Greenhouse Blitz

Jim and I were scheduled to go leave to go work on disassembling the greenhouses about noon, and I was overly optimistic about what we might be able to accomplish, so I suggested we bring both my trailers.

My equipment hauler was loaded down with stuff, so I spent part of the morning before we left getting Everything off of it that was on it, getting it ready to hook up to Jim’s trailer.

I drained the water out of the big water tank that I was using to gravity feed the pressure washer. I stacked the wood up near the tool shed next to the work barn, and I got my extra hitch set up so that the trailer would be towable on Jim’s truck. Though I bought that extra hitch for the tree service business, It’s good to have it even with that business having failed.

Jim and I spent a good little while in disassembly. Once again, it was pretty slow going, not making anywhere near as much progress as I had hoped, but at least it was some progress.

Bit by bit, we’ll get this done. 🙃

Lift the world.

~ stephen

tracks site visitors

Leave a comment